Environmental Protection Agency (EPA) – Tenant Improvements at the Ronald Reagan Building & International Trade Center

Washington, D.C.
Owner: General Services Administration
Architect: Ellerbe Becket
Engineer: Ellerbe Becket
Contract Value: $1.5 Million

This project was a full tenant buildout for HVAC piping/plumbing/ductwork/insulation and controls spread over fourteen partial floors.  The duct system included 9 fan coil units, 50 fans, 68 VAV boxes, 21 modular cooling units, and 1614 linear feet of Stripling diffusers.  The plumbing piping system included the addition of 13 plumbing fixtures to those already installed as base contract work, and the installation of 11 insta-hot water heaters.