Kaiser Permanente

Silver Spring, MD
Owner: Kaiser Permanente
Architect: Cannon
Engineer: Cannon
Contract Value: $1.1 Million

This medical center was built on a fast track schedule.  The building mechanical systems included 5 VAV roof top units totaling 170 tons, over 100 VAV boxes with reheat coils and all associated ductwork and piping.  The plumbing system comprised of all typical plumbing work and the installation of 400 oil fired hot water heaters and related pumps.  Two remote fuel oil tanks and their associated double wall piping were supplied and installed to service the water heaters.